Home › Cases › Commercial property › Taganrog, the Chekhov hotel

Boutique hotel with 18 rooms — a furnishing package from China turnkey

The Chekhov Hotel in Taganrog. Everything was ordered through MBL: wall panels, a marble staircase, case and upholstered furniture, kitchens, wardrobes, the full bathroom fit-out, sanitary ware, lighting, decor, curtains, bed linen, towels, bathrobes and slippers.

Taganrog, the Chekhov Hotel 18 rooms turnkey From the staircase to the slippers One supplier for the whole property
The Chekhov hotel: 18 rooms furnished turnkey

‘Our task was not simply to select furniture, but to fully furnish the hotel so that the property was completely ready to receive guests and to operate.’

‘We chose MBL because it was important to cover a large furnishing package through a single team — to minimise errors when placing the order and to avoid spending time sourcing components from a dozen suppliers.’

O
Olga Project designer · Chekhov hotel, Taganrog
Real review
18 rooms
furnished turnkey
1 supplier
instead of a dozen contractors
8 areas
from reception to the dining room
100 %
including textiles and consumables

What was ordered and at what price

The prices on screen in the video are the factory cost of the item, without logistics

Reception
$3 028

Reception desk

The first thing a guest sees. The materials, the lighting and the furniture were put together as a single composition.

Common areas
$2 839

A set of partitions

Several pattern options: each room was given its own character, while staying within the single style of the hotel.

Lounge area
$1 090

Sofa

The communal area on the second floor — materials were chosen to take daily wear.

Lounge area
$897

Pouffe

Accent orange, textured upholstery.

Guest rooms
$711

Armchair

In the rooms and lounge areas.

Luxury suite
$827

Bathtub

Free-standing, it became part of the interior composition of the room.

Lighting
$345

Chandelier

Plus light fittings at $99 — the lighting came with the same order.

Bathrooms
$240

Shower system

Brass mixer taps at $117. The sanitaryware was purchased for all 18 rooms at once.

How the project was run

Specification

A full list of items across every area and room — the main task was to miss nothing.

Approval

Furnishing coordinator Aydana kept in touch with the factories and, where needed, arranged meetings with manufacturers on the client’s behalf.

Production

Many repeating items plus bespoke ones: the partitions were developed in several versions.

Logistics and control

Schedules, quality and acceptance across every product group — from door units to bed linen.

!

Why a hotel furnishing package is not done piecemeal

Eighteen rooms is not a single flat but a large property with many repeating and individual items at the same time. Working independently with different manufacturers, production and delivery schedules drift apart and nobody is responsible for the quality as a whole. Here the entire volume was handled by one team.

From the video testimonial

The quality of the product exceeded our expectations. Every element, from the door units to the interior pieces, is made to a high professional standard.

Olga, project designer

Full video — a tour of the Chekhov hotel

10 minutes: every area of the hotel and a breakdown of the furnishing process

What you will see in the video

Olga walks through the whole property: the hall and reception, the marble staircase, the lounge area, the corridors, the different room types, the family room, the suite with a bath and the dining room.

The second half is about the process itself: the specification, approvals, production, logistics and why a single supplier matters for a hotel project.

💡 Not loading on one platform — switch to the other tab above.

The hotel on camera

19 stills from the video tour

We will prepare the same estimate for your apartment

Preliminary estimate for 10–15 key items, broken down by room. Timing depends on the project size and factory responses. Including logistics to your city.

Leave a request

We'll reply within a business day. The time to prepare a preliminary estimate depends on the project size and factory responses.

Faster — messengers

Straight into the chat with a manager.

The manager has been running MBL projects since 2008

Similar projects

Other commercial projects and large furnishing packages