Minimum order from $30,000 - that's the whole container, not a single item
Molteniart.

Chair Molteni D.235.1

Minimum order — from $30 000 на объект

Model изготавливается made to order в составе комплектации. Стоимость зависит от материалов, размеров и фабрики — подготовим предварительный расчёт по вашему проекту.

Video: как мы привозим мебель from China — MBLVideo: a home furnished with brands — what we bring from China and at what price
Ask a manager:TelegramWhatsAppMAX
How to order: through the furniture tour - or . Orders from $30,000 на объект.
Why is the price on request?

Стоимость зависит от материал и обивка, цвет и фактура, размер и конфигурация, batch production, фабрика - у одной models цена различается в разы. Поэтому готовим предварительный расчёт под ваш проект, а не показываем усреднённую цифру.

Sizes
507*516*866 mm
Room
—
Production
45 days
Delivery
worldwide

Chair D.235.1 from the Italian factory Molteni&C is a true masterpiece of furniture design with an interesting history. Italian designer Gio Ponti in 1938 developed the design project for the Montecatini building in Piazza Largo Donegani in Milan. In addition to architectural solutions, Ponti also created tables, chairs, lamps and cabinets, among which was the model D.235.1.
The chair is entirely made of polished aluminum, which makes the structure light and further emphasizes its modern, and even slightly futuristic appearance. In 2014, Molteni created an updated version of the D.235.2 chair. - with seat and back made of genuine leather (various color options available). The legs are supplemented with plastic inserts to reduce slipping and scratching of the floor surface. Seat height - 44.6 cm.

Brand
Molteni
Sizes
507*516*866 mm
Colors
Grey
Materials
metal
Production
45 days, made to order

All products are made to order at Chinese factories. Production takes 45 days. Delivery time depends on your location; we handle customs and logistics turnkey.

Minimum order - from $30,000 (the whole order).

Made-to-order productionat Chinese factories
Quality controlinspection before shipping
Turnkey deliverycustoms and logistics
45-day lead timefrom order to shipping
In the interior

In real spaces

Chair Molteni D.235.1 в интерьере
Chair Molteni D.235.1 в интерьере
Chair Molteni D.235.1 в интерьере
We bring this model in to order from the factoryLead time 30–45 days, quality control with photo and video reports, delivery and customs clearance turnkey. We have worked under contract as a legal entity since 2008.
How the tour worksCasesContract and guarantees