Minimum order from $30,000 - that's the whole container, not a single item
SERIPart. 116279

SERIP Aqua PA630/4 floor lamp

Minimum order — from $30 000 на объект

Model изготавливается made to order в составе комплектации. Стоимость зависит от материалов, размеров и фабрики — подготовим предварительный расчёт по вашему проекту.

Video: как мы привозим мебель from China — MBLVideo: a home furnished with brands — what we bring from China and at what price
Ask a manager:TelegramWhatsAppMAX
How to order: through the furniture tour - or . Orders from $30,000 на объект.
Why is the price on request?

Стоимость зависит от материал и обивка, цвет и фактура, размер и конфигурация, batch production, фабрика - у одной models цена различается в разы. Поэтому готовим предварительный расчёт под ваш проект, а не показываем усреднённую цифру.

Sizes
600*1870 mm (size to order)
Room
Living room, Cabinet, Bedroom, Kitchen, Dining room
Production
45 days
Delivery
worldwide

The SERIP Aqua PA630/4 floor lamp is an excellent and sophisticated lighting source that brings a touch of natural beauty and freshness to your interior. This floor lamp was created by SERIP, which is famous for its quality and unique design solutions, and is a combination of elegance and natural elegance.

The SERIP Aqua PA630/4 floor lamp looks like clusters of drops, just about ready to fall from a bronze branch. The lamp is produced using glass that does not contain lead. All glass parts are made by hand. This is not just a lighting device, but a real art object that even the most discerning aesthetes will appreciate. 

Brand
SERIP
Model
Aqua PA630/4
Sizes
600*1870 mm (size to order)
Colors
GoldenWhite
Materials
glass, brass
Style
modern, branded, art deco
Room
Living room, Cabinet, Bedroom, Kitchen, Dining room
Production
45 days, made to order

All products are made to order at Chinese factories. Production takes 45 days. Delivery time depends on your location; we handle customs and logistics turnkey.

Minimum order - from $30,000 (the whole order).

Made-to-order productionat Chinese factories
Quality controlinspection before shipping
Turnkey deliverycustoms and logistics
45-day lead timefrom order to shipping
In the interior

In real spaces

SERIP Aqua PA630/4 floor lamp в интерьере
SERIP Aqua PA630/4 floor lamp в интерьере
SERIP Aqua PA630/4 floor lamp в интерьере
We bring this model in to order from the factoryLead time 30–45 days, quality control with photo and video reports, delivery and customs clearance turnkey. We have worked under contract as a legal entity since 2008.
How the tour worksCasesContract and guarantees